Technical support the installation of the granite
Granite as a stone with beautiful patterns and it is very popular and how to install the granite rock with both the installation by securing the granite rock to the Structure directly to the wall or surface that is a concrete and a type 2 that is installed by the granite rock is attached to the chassis and steel used in the event that the structure as a wall light mass and brick on how to install the granite rock by the combination of the limestone sand in the proper ratio by using the sand that is clean and free of contaminants to the ingredients and to increase efficiency in the traction should mix limestone collaboration with the other ingredients.
Caution:
During the installation of the granite rock is that if the surface of the granite rock formations of the stains should be cleaned as soon as possible to prevent the stains which can be difficult to clean and make it the stains. Before the granite should be granite rock, with by the granite rock to clean and dip it in the solution and the sealing rings in the sun to dry to spread the right steps when the granite is completed by the vertical medication by selecting the medication that is appropriate for the granite and clean the surface immediately when the granite and finished to prevent dirt from the left vertical medication dry on the floor and granite cause problems white residue stains that maintain difficult.
The installation process
To prepare the installation space the floor granite rock is the primary way in three ways:
1. Installation by using the limestone (MORTAR) sand
is the method that is suitable for the area that is not adjust the level and scrub it.
* Check the level of the area that will make the stone with a level for a mixture of the limestone (MORTAR) sand to stone is between 3 - 5 cm (not including the thickness of the stone) If more or less than the should resolve
* mix the plaster sand in the ratio of 1 liter of water and 4 kilograms and sand, 8 - 10 kg.
* The mixture is poured into the area to install the rock and make adjustments to the level before you remove the stone into the installation.
* using the adhesive cement and water painted on the back of the stone to install, and then lift the place on the desired position by using a rubber mallet and tap lightly so that it is level or use a liquid limestone collaboration painted on the back of the stone to be installed instead. (which is the most popular method is now because it quickly and easily.)
* to place the stone and the seams are in alignment with the groove between the seams for approximately 1-2 mm when the place the Rocks area and then let the MORTAR for approximately 72 hours
* after is the process of medication the seams between the rock to prevent soil accumulation on the rock by cleaning the seam of the rock with the use of a needle or brush hard then use the material of the compression, Full to not have the foam and air voids the remainder of the material of the excess out immediately wipe out as soon as possible with a damp cloth before the material of medication will freeze
Caution:
* should not be installed by using the dumplings since there will be cavitation is a gap under the surface of the granite rock may be a result of granite chipping paint and brittle.
* The ingredients of the limestone MORTAR cement adhesive Collaboration Solution limestone and the material of medication, please ask the manufacturer to prevent the error later.
2. The installation by using the adhesive cement
is another way that is fast and convenient for the area of the successfully. Because the adhesive cement also is a component of the cement Portland, sand and material special blend the other but each manufacturer.
* Check the level of the area that will make the stone to the level you want if more or less than the edit
* wipe clean the surface clean and free of dust, oil color of the limestone and other foreign particles and sweep the water on the surface of the prior to using cement adhesive
* mixed glue to cement the and the way of the manufacturer of the adhesive cement in general the adhesive cement 1 bag (15 - 20 kg.) per 3 - 5 L, and then each brand that specify the ingredients?
* The cement adhesive on the floor, enough for the rock to install use the comb teeth to dislodge the groove across the including the area behind the stone that will be installed with (the number of the comb, but the model, brand, cement adhesive that use), and then remove the stone laid down on the cement adhesive tap with a rubber mallet gently to level.
* The stone and the evidence in the same orientation with the groove between the seams for about 1 - 2 mm when the place the Rocks area and then let the adhesive on the cement (based on the duration of the adhesive cement select use) by during this should be clean and protected with a plastic POLYHENE SHEET and corrugated cardboard or plywood as but the weather the page so that the construction of the other sections can be made by the surface is not damaged.
* after is the process of medication the seam between the rocks to prevent dirt and hold the stone by cleaning the seam of the rock with the use of a needle or brush hard after that use the Material of medication, Full to not have the foam and air pockets of debris of medication that excess out immediately wipe out as soon as possible with a damp cloth before the material of medication will freeze
Caution:
* using the adhesive cement should follow the way of the company for each manufacturer of brands only by asking questions and learn how to use of the manufacturer.
* It should be noted that the adhesive cement select use has expired or by normal cement adhesive life will be approximately 3 months from the date of manufacture to use sticky notes to cement the expiration date may be made to the rock that excessive corrosion at a later time.
3. The installation by using the adhesive for the installation of the rock
is the ideal for covered the floor such as a ceramic tile, marble floors, granite rock, stone, wood floors without the need to dismantle the old or use with the area that you want to use
* Check the floor before that there is excessive corrosion or cracks? If there is a need to do to edit before
* wipe clean the surface to be clean and free of dust, oil and other foreign particles and wipe surfaces to air dry completely.
* after that follow the instructions of the Company. The manufacturer of adhesive that select use because the adhesive each brand products
will have different ways.
* The adhesive on the floor, enough for the rock to install use the comb teeth to dislodge the groove across the including the area behind the stone that will be installed with and then remove the stone laid down on the adhesive tap with a rubber mallet gently so that it is level
* to place the stone and the evidence in the same orientation with the groove between the seams for about 1 - 2 mm when the place the Rocks area and let the adhesive on the (based on the duration of adhesive that select Use)
* after is the process of medication the seams between the rocks to prevent soil accumulation on the rock by cleaning the seam of the rock with the use of a needle or brush hard after that use the Material of medication, Full to not have the foam and air voids the remainder of the material of the excess out immediately wipe out as soon as possible with a damp cloth before the material of medication will freeze
Caution:
* to the security should consult with an expert architect or the company prior to the installation of
the use of the adhesive is a way that is not popular in our home because it is expensive to find a spool so difficult before you use should consult with the technician and company as a Distributor, the glue it.
The installation of granite wall
is the primary way in 2 ways:
1. To install a highly dry process/mechanical fixing)
* Check the wall that will complete the installation that is a structure (Use Agaricus campestris wall mounting) or a brick walls or does not have a structure (, set a metal frame to hold the Agaricus campestris)
* do spread the screen color stone (a), the control check before you install the
* Discarding vertical and find the level of the paving stone and find the fraction of the stone as a buffet in a approved or in the opinion of the control tasks.
* The drilling or notch in the rock to hold the Agaricus campestris should not puncture, too wide because it will make the stone space is low to affect the strength.
* The epoxy in the groove at the notch in the rock to hold the Agaricus campestris should enter the full to go to instead of the flesh of the loss.
* The installation should enter MORTAR after the Rocks, the foundation up from ground level approximately 1 meters
to the impact and helps get the weight from the rock wall at the top with the
Note:
* The installation of DRY PROCRESS is ideal for mounting to the rock that is absorbed by the high water because it will help in the evaporation of water and is not a duplicate the water, the color change rock, the beautiful down.
* is suitable for outside the building to reduce the salsa template (salt, cement, white residue). After the installation
2. Install the wet-(wet process).
* Check the skin. The wall area that will install the clean, free of grease and dust juice round the limestone sand at the island and rinse clean with water.
* mix the plaster sand with the ratio of water and should use the clean water in the combination of acid or alkali
* should enter the peg. S to help in the traction
* to enter the glue RTA to enter the full to the excessive corrosion
* after the stone completed, MORTAR antifreeze by is not affect a period of at least 2 days.
* The Medication the seam with adhesive cement for medication along the left until the medication limestone along the dry cloth and started to wipe clean the water stains limestone on the stone out,
Liquid Wax
Maintenance of granite rock (granite)
before installing the granite rock the user should have the protection of the ring of the water from the first instance to the floor and to the rock to help reduce the Ring of water with omni-directional scanning of by using the Product, ring with granite rock especially should be 02031 sealing ring both 6 sides of the meat and leave it for at least 1 full days to allow the solution to ring in to react to the rock and then remove the stone painted the solution to air dry completely.
Caution:
for the maintenance of the surface of the granite rock is to select the Use the product clean and polish the product that should not be used to clean the granite rock is the detergent solution or scrub the bathrooms as well as the cleaning fluid the acids including paraffin oil or olive oil because it will make your skin of the rocks at the end of the condition of the shadow of the problem of the soil from rust-, rubber trees, water limestone, etc. that may result from the use of it should use the dedicated cleaning products to use in the remove dirt that does not to leave the traces on the stone floor after the use of cleaning products and should use a solution polished wax type of water that is called the liquid wax